info@eleccommc.com

Awarded Overhead and Underground Communication Projects

Everett to Chelsea Underground Station Fiber Install:

  • Crews performed manhole surveys and performed rod and rope in 59 manholes to proof a path. Smooth wall inner duct 1.25 inch was installed into 59 sections for a total footage of 20,000 feet from station yard to station house. Crews installed 24,000 feet of 48 count fiber AFL Mini-Span 535 in route leaving 100 foot slack coils in manholes ever 2000 feet for future use. All manholes got posted installed with fire tape, fire brick and tags per Eversource standards. 48 count fiber was butt spliced along route and terminated in the station patch panels per standards. Fiber was tested bi-direction at two wavelengths to test loss and continuity. Crews average 3000 feet per shift for installation.

Cambridge to Belmont Underground Station Fiber:

  • Crews performed manhole surveys and performed rod and rope in 51 manholes to proof a path. Smooth wall inner duct 1.25 inch was installed into 51 sections for a total footage of 10,000 feet from station house to demark manhole. Crews installed 14,000 feet of 48 count fiber AFL Mini-Span 535 in route leaving 100 foot slack coils in manholes ever 2000 feet for future use. All manholes got posted installed with fire tape, fire brick and tags per Eversource standards. 48 count fiber was butt spliced along route and terminated in the station patch panels and manholes per standards. All fiber was running OSP and ISP and installed to manufacture specs. Fiber was tested bi-direction at two wavelengths to test loss and continuity.

UPS Pole Sets:

Overhead crews set new 35 foot class 4 poles for UPS to supply a temporary feed to a truck loading station to handle Christmas shipments.  Crews worked with electrician and installed 500 feet of 1 AWG, 3 phase wire from building weather head out to new loading station.

  • 5-foot class 4 utility poles
  • 277 / 480-volt system 3 phase

Boston Light and Node Project:

Underground crews installed over 2000 feet of #4 AWG compact secondary wire from Eversource manholes to city light poles to supply cell phone and internet antennas.

  • Voltage 120 / 240 and 100 amp system
  • Splicing was performed with sweetheart aluminum bus connectors and H-tap connections in handholes

Netting Jobs:

Overhead crews installed utility poles and netting to protect areas around golf courses and ball fields.  Jobs included setting utility poles, running strand, and installing hundreds of feet of netting.

  • Utility poles from 40 feet up to 55 feet
  • Galvanized strand and hardware from ¼ inch to 5/16 in diameter
Contact Us

ElecComm Corporation
785 Woburn Street
Wilmington, MA 01887






Captcha Image